Toyka's Deicing and Anti Icing System enables high-speed train operations to run smoothly and without disruption during snowy and icy conditions in winter, ensuring the longevity of high-speed train systems and bogies.
The system functions by applying a special solution sprayed from its nozzles onto the underside of the trains, effectively eliminating snow and ice formation on the bogies and undercarriages.
At Toyka's facility, deicing and anti icing processes can be conducted for both CAF and Siemens train sets. This eliminates the need for separate facilities for these different sets, streamlining operations. The deicing process can be completed within a maximum of 30 minutes, ensuring that the trains are ready for service promptly.
The facility is entirely based on domestic engineering design and manufacturing. All software, hardware, and their selections have been made by domestic engineers.
Toyka stands unparalleled in understanding and managing snow and ice formation in high-speed train bogies. With expertise in engineering, manufacturing, installation, data analysis, consultancy, service, and maintenance, no other company is capable of providing a deicing and anti icing system.
The system has no equal or counterpart anywhere in the world.